Theistareykir 1 & 2 Project
Iceland
For this particular project in Iceland, we designed, delivered, and installed the cold end system for two 45 MW geothermal power plants. At the heart of the system is a uniquely engineered water-cooled surface condenser that enables efficient abatement of H₂S and other climate-impacting gases.
- Geothermal Power Plant with 90 MW capacity
- Main equipment: 2 Condensers
- Location: Þeistareykir, Iceland
- End-user: National Power Company of Iceland
- NEM Client: Landsvirkjun
- Commercial Operating year: 2018